The data center construction market was valued at approximately US$ 234.85 billion in 2022 and is projected to grow to around US$ 448.14 billion by 2030, reflecting a compound annual growth rate (CAGR) of 8.4% during the period from 2022 to 2030.
The report on the data center construction market encompasses various regions, including North America, Europe, Asia Pacific, the Middle East and Africa, as well as South and Central America.
In the United States, the data center sector is poised for significant transformation in the coming years, driven by new federal regulations and initiatives from the current presidential administration aimed at optimizing data center operations. The construction market for data centers in the US is also expected to expand due to the introduction of tax incentives and lower electricity costs. However, the escalating expenses associated with construction and installation present a considerable challenge to the growth of data centers in the nation. Despite these hurdles, major corporations like Google, Facebook, and Amazon are actively constructing their proprietary data centers throughout the US. Notably, in December 2023, Digital Realty announced a partnership with funds affiliated with Blackstone, focusing on the development of four hyperscale data center campuses across three metropolitan areas. Consequently, the market share for data center construction in the US is on the rise, fueled by the increasing number of new data center projects.
In China, the surge in mobile data users and smartphone connections?now surpassing traditional personal computer connections?along with a growing reliance on mobile internet services, is a significant factor driving the expansion of the data center construction market. The presence of major telecommunications companies necessitating enhanced storage capacity further supports market growth in the region. As a global manufacturing powerhouse and the largest exporter of numerous goods, China plays a crucial role in international trade. The ongoing economic growth in China, coupled with the operations of various manufacturing and international firms, leads to an escalating demand for scalable data centers. In December 2023, China made headlines by commencing the assembly of an underwater commercial data center off the coast of Sanya on Hainan Island. Similarly, in November 2023, a collaboration between Saudi Call (an ICT service provider), China Mobile International Limited (CMI), and Shanghai Lumaotong Group (LMT) was announced to initiate the construction of data centers in Saudi Arabia.
The competitive landscape in the banking and finance sector is prompting companies to enhance their IT infrastructure. To offer customers advanced banking solutions, including mobile banking, application-based services, mobile web access, and SMS services, financial institutions require data center service providers that can ensure security, compliance, flexibility, and scalability. Additionally, as digitization permeates various sectors beyond banking and finance, service providers must continuously assess their operations to adapt to evolving customer demands and expectations. This need for robust IT infrastructure drives the demand for data centers, leading to an increase in their construction.
**Data Center Construction Market Segmentation:**
The analysis of the data center construction market has been conducted by examining several segments, including construction type, Tier design, and industry vertical. In terms of construction type, the market is divided into general construction, electrical construction, and mechanical construction. Regarding Tier design, the market is categorized into Tier 1, Tier 2, Tier 3, and Tier 4. Furthermore, the industry vertical segmentation includes IT & telecom, banking, financial services and insurance (BFSI), government, manufacturing, retail, transportation, media & entertainment, and others. The report highlights growth opportunities based on current trends in the data center construction market and the factors driving its expansion.
**Competitive Landscape and Key Developments in the Data Center Construction Market**
The report on the data center construction market includes profiles of key players such as Rittal GmbH & Co. K.G., Schneider Electric SE, DPR Construction Inc., Mercury Engineering Ltd., STO Building Group Inc., AECOM, HOLDER CONSTRUCTION COMPANY, Turner Construction Co., Eaton Corp Plc, and Nikom InfraSolutions Pvt. Ltd. A comprehensive analysis of several other significant players in the data center construction market has also been conducted to provide a well-rounded perspective of the market and its ecosystem. The forecast for the data center construction market can assist stakeholders in strategizing their growth initiatives.
TABLE OF CONTENTS
1. Introduction
1.1 Research Report Guidance
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
4. Data Center Construction Market Landscape
4.1 Overview
4.2 PEST Analysis
4.3 Ecosystem Analysis
 4.3.1 List of Vendors in the Value Chain
5. Data Center Construction Market - Key Market Dynamics
5.1 Data Center Construction Market - Key Market Dynamics
 5.1.1 Rise in Launch of New Edge Data Centers
 5.1.2 Rapid Expansion of IoT Services
 5.1.3 Surge in Data Center Construction Activities
5.2 Market Restraints
 5.2.1 Rise in Cost of Infrastructure Development
 5.2.2 Complexities in Data Center Infrastructure and its Establishment
5.3 Market Opportunities
 5.3.1 Increasing Implementation of Hyperscalers and Colocation
 5.3.2 Growing Construction of Tier 4 Data Centers
5.4 Future Trends
 5.4.1 Increasing Adoption of Green Data Centers
5.5 Impact of Drivers and Restraints:
6. Data Center Construction Market - Global Market Analysis
6.1 Data Center Construction Market Revenue (US$ Million), 2022-2030
6.2 Data Center Construction Market Forecast Analysis
7. Data Center Construction Market Analysis - by Type Of Construction
7.1 Electrical Construction
 7.1.1 Overview
 7.1.2 Electrical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.2 General Construction
 7.2.1 Overview
 7.2.2 General Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.3 Mechanical Construction
 7.3.1 Overview
 7.3.2 Mechanical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8. Data Center Construction Market Analysis - by Tier Standard
 8.1 Tier 3
 8.1.1 Overview
 8.1.2 Tier 3: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 8.2 Tier 4
 8.2.1 Overview
 8.2.2 Tier 4: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 8.3 Tier 1 and Tier 2
 8.3.1 Overview
 8.3.2 Tier 1 and Tier 2: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9. Data Center Construction Market Analysis - by Industry Vertical
9.1 IT and telecommunication
 9.1.1 Overview
 9.1.2 IT and telecommunication: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.2 BFSI
 9.2.1 Overview
 9.2.2 BFSI: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.3 Media and Entertainment
 9.3.1 Overview
 9.3.2 Media and Entertainment: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.4 Retail
 9.4.1 Overview
 9.4.2 Retail: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.5 Manufacturing
 9.5.1 Overview
 9.5.2 Manufacturing: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.6 Government
 9.6.1 Overview
 9.6.2 Government: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.7 Transportation
 9.7.1 Overview
 9.7.2 Transportation: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.8 Others
 9.8.1 Overview
 9.8.2 Others: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10. Data Center Construction Market - Geographical Analysis
10.1 Overview
10.2 North America
 10.2.1 North America Data Center Construction Market Overview
 10.2.2 North America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.2.3 North America: Data Center Construction Market Breakdown, by Type Of Construction
 10.2.3.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
 10.2.4 North America: Data Center Construction Market Breakdown, by Tier Standard
 10.2.4.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
 10.2.5 North America: Data Center Construction Market Breakdown, by Industry Vertical
 10.2.5.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
 10.2.6 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.2.6.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.2.6.2 United States: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.2.6.2.1 United States: Data Center Construction Market Breakdown, by Type Of Construction
 10.2.6.2.2 United States: Data Center Construction Market Breakdown, by Tier Standard
 10.2.6.2.3 United States: Data Center Construction Market Breakdown, by Industry Vertical
 10.2.6.3 Canada: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.2.6.3.1 Canada: Data Center Construction Market Breakdown, by Type Of Construction
 10.2.6.3.2 Canada: Data Center Construction Market Breakdown, by Tier Standard
 10.2.6.3.3 Canada: Data Center Construction Market Breakdown, by Industry Vertical
 10.2.6.4 Mexico: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.2.6.4.1 Mexico: Data Center Construction Market Breakdown, by Type Of Construction
 10.2.6.4.2 Mexico: Data Center Construction Market Breakdown, by Tier Standard
 10.2.6.4.3 Mexico: Data Center Construction Market Breakdown, by Industry Vertical
10.3 Europe
 10.3.1 Europe Data Center Construction Market Overview
 10.3.2 Europe: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.3.3 Europe: Data Center Construction Market Breakdown, by Type Of Construction
 10.3.3.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
 10.3.4 Europe: Data Center Construction Market Breakdown, by Tier Standard
 10.3.4.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
 10.3.5 Europe: Data Center Construction Market Breakdown, by Industry Vertical
 10.3.5.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
 10.3.6 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.3.6.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.3.6.2 Germany: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.3.6.2.1 Germany: Data Center Construction Market Breakdown, by Type Of Construction
 10.3.6.2.2 Germany: Data Center Construction Market Breakdown, by Tier Standard
 10.3.6.2.3 Germany: Data Center Construction Market Breakdown, by Industry Vertical
 10.3.6.3 United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.3.6.3.1 United Kingdom: Data Center Construction Market Breakdown, by Type Of Construction
 10.3.6.3.2 United Kingdom: Data Center Construction Market Breakdown, by Tier Standard
 10.3.6.3.3 United Kingdom: Data Center Construction Market Breakdown, by Industry Vertical
 10.3.6.4 France: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.3.6.4.1 France: Data Center Construction Market Breakdown, by Type Of Construction
 10.3.6.4.2 France: Data Center Construction Market Breakdown, by Tier Standard
 10.3.6.4.3 France: Data Center Construction Market Breakdown, by Industry Vertical
 10.3.6.5 Sweden: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.3.6.5.1 Sweden: Data Center Construction Market Breakdown, by Type Of Construction
 10.3.6.5.2 Sweden: Data Center Construction Market Breakdown, by Tier Standard
 10.3.6.5.3 Sweden: Data Center Construction Market Breakdown, by Industry Vertical
 10.3.6.6 Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.3.6.6.1 Rest of Europe: Data Center Construction Market Breakdown, by Type Of Construction
 10.3.6.6.2 Rest of Europe: Data Center Construction Market Breakdown, by Tier Standard
 10.3.6.6.3 Rest of Europe: Data Center Construction Market Breakdown, by Industry Vertical
10.4 Asia Pacific
 10.4.1 Asia Pacific Data Center Construction Market Overview
 10.4.2 Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.3 Asia Pacific: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.3.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
 10.4.4 Asia Pacific: Data Center Construction Market Breakdown, by Tier Standard
 10.4.4.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
 10.4.5 Asia Pacific: Data Center Construction Market Breakdown, by Industry Vertical
 10.4.5.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
 10.4.6 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.4.6.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.4.6.2 China: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.6.2.1 China: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.6.2.2 China: Data Center Construction Market Breakdown, by Tier Standard
 10.4.6.2.3 China: Data Center Construction Market Breakdown, by Industry Vertical
 10.4.6.3 Japan: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.6.3.1 Japan: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.6.3.2 Japan: Data Center Construction Market Breakdown, by Tier Standard
 10.4.6.3.3 Japan: Data Center Construction Market Breakdown, by Industry Vertical
 10.4.6.4 South Korea: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.6.4.1 South Korea: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.6.4.2 South Korea: Data Center Construction Market Breakdown, by Tier Standard
 10.4.6.4.3 South Korea: Data Center Construction Market Breakdown, by Industry Vertical
 10.4.6.5 India: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.6.5.1 India: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.6.5.2 India: Data Center Construction Market Breakdown, by Tier Standard
 10.4.6.5.3 India: Data Center Construction Market Breakdown, by Industry Vertical
 10.4.6.6 Australia: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.6.6.1 Australia: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.6.6.2 Australia: Data Center Construction Market Breakdown, by Tier Standard
 10.4.6.6.3 Australia: Data Center Construction Market Breakdown, by Industry Vertical
 10.4.6.7 Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.4.6.7.1 Rest of APAC: Data Center Construction Market Breakdown, by Type Of Construction
 10.4.6.7.2 Rest of APAC: Data Center Construction Market Breakdown, by Tier Standard
 10.4.6.7.3 Rest of APAC: Data Center Construction Market Breakdown, by Industry Vertical
10.5 Middle East and Africa
 10.5.1 Middle East and Africa Data Center Construction Market Overview
 10.5.2 Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.5.3 Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction
 10.5.3.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
 10.5.4 Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard
 10.5.4.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
 10.5.5 Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical
 10.5.5.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
 10.5.6 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.5.6.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.5.6.2 Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.5.6.2.1 Saudi Arabia: Data Center Construction Market Breakdown, by Type Of Construction
 10.5.6.2.2 Saudi Arabia: Data Center Construction Market Breakdown, by Tier Standard
 10.5.6.2.3 Saudi Arabia: Data Center Construction Market Breakdown, by Industry Vertical
 10.5.6.3 United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.5.6.3.1 United Arab Emirates: Data Center Construction Market Breakdown, by Type Of Construction
 10.5.6.3.2 United Arab Emirates: Data Center Construction Market Breakdown, by Tier Standard
 10.5.6.3.3 United Arab Emirates: Data Center Construction Market Breakdown, by Industry Vertical
 10.5.6.4 South Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.5.6.4.1 South Africa: Data Center Construction Market Breakdown, by Type Of Construction
 10.5.6.4.2 South Africa: Data Center Construction Market Breakdown, by Tier Standard
 10.5.6.4.3 South Africa: Data Center Construction Market Breakdown, by Industry Vertical
 10.5.6.5 Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.5.6.5.1 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction
 10.5.6.5.2 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard
 10.5.6.5.3 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.6 South and Central America
 10.6.1 South and Central America Data Center Construction Market Overview
 10.6.2 South and Central America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.6.3 South and Central America: Data Center Construction Market Breakdown, by Type Of Construction
 10.6.3.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
 10.6.4 South and Central America: Data Center Construction Market Breakdown, by Tier Standard
 10.6.4.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
 10.6.5 South and Central America: Data Center Construction Market Breakdown, by Industry Vertical
 10.6.5.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
 10.6.6 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.6.6.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
 10.6.6.2 Brazil: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.6.6.2.1 Brazil: Data Center Construction Market Breakdown, by Type Of Construction
 10.6.6.2.2 Brazil: Data Center Construction Market Breakdown, by Tier Standard
 10.6.6.2.3 Brazil: Data Center Construction Market Breakdown, by Industry Vertical
 10.6.6.3 Argentina: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.6.6.3.1 Argentina: Data Center Construction Market Breakdown, by Type Of Construction
 10.6.6.3.2 Argentina: Data Center Construction Market Breakdown, by Tier Standard
 10.6.6.3.3 Argentina: Data Center Construction Market Breakdown, by Industry Vertical
 10.6.6.4 Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
 10.6.6.4.1 Rest of South and Central America: Data Center Construction Market Breakdown, by Type Of Construction
 10.6.6.4.2 Rest of South and Central America: Data Center Construction Market Breakdown, by Tier Standard
 10.6.6.4.3 Rest of South and Central America: Data Center Construction Market Breakdown, by Industry Vertical
11. Competitive Landscape
11.1 Heat Map Analysis by Key Players
11.2 Company Positioning & Concentration
12. Industry Landscape
12.1 Overview
12.2 Market Initiative
13. Company Profiles
13.1 Rittal GmbH & Co KG
 13.1.1 Key Facts
 13.1.2 Business Description
 13.1.3 Products and Services
 13.1.4 Financial Overview
 13.1.5 SWOT Analysis
 13.1.6 Key Developments
13.2 Schneider Electric SE
 13.2.1 Key Facts
 13.2.2 Business Description
 13.2.3 Products and Services
 13.2.4 Financial Overview
 13.2.5 SWOT Analysis
 13.2.6 Key Developments
13.3 DPR Construction Inc
 13.3.1 Key Facts
 13.3.2 Business Description
 13.3.3 Products and Services
 13.3.4 Financial Overview
 13.3.5 SWOT Analysis
 13.3.6 Key Developments
13.4 Mercury Engineering Ltd
 13.4.1 Key Facts
 13.4.2 Business Description
 13.4.3 Products and Services
 13.4.4 Financial Overview
 13.4.5 SWOT Analysis
 13.4.6 Key Developments
13.5 STO Building Group Inc
 13.5.1 Key Facts
 13.5.2 Business Description
 13.5.3 Products and Services
 13.5.4 Financial Overview
 13.5.5 SWOT Analysis
 13.5.6 Key Developments
13.6 AECOM
 13.6.1 Key Facts
 13.6.2 Business Description
 13.6.3 Products and Services
 13.6.4 Financial Overview
 13.6.5 SWOT Analysis
 13.6.6 Key Developments
13.7 HOLDER CONSTRUCTION COMPANY
 13.7.1 Key Facts
 13.7.2 Business Description
 13.7.3 Products and Services
 13.7.4 Financial Overview
 13.7.5 SWOT Analysis
 13.7.6 Key Developments
13.8 Turner Construction Co
 13.8.1 Key Facts
 13.8.2 Business Description
 13.8.3 Products and Services
 13.8.4 Financial Overview
 13.8.5 SWOT Analysis
 13.8.6 Key Developments
13.9 Eaton Corp Plc
 13.9.1 Key Facts
 13.9.2 Business Description
 13.9.3 Products and Services
 13.9.4 Financial Overview
 13.9.5 SWOT Analysis
 13.9.6 Key Developments
13.10 Nikom InfraSolutions Pvt. Ltd
 13.10.1 Key Facts
 13.10.2 Business Description
 13.10.3 Products and Services
 13.10.4 Financial Overview
 13.10.5 SWOT Analysis
 13.10.6 Key Developments
14. Appendix
14.1 About
LIST OF TABLES
Table 1. Data Center Construction Market Segmentation
Table 2. List of Vendors
Table 3. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Table 4. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Type Of Construction
Table 5. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Tier Standard
Table 6. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 7. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 8. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 9. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 10. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 11. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 12. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 13. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 14. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 15. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 16. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 17. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 18. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 19. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 20. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 21. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 22. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 23. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 24. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 25. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 26. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 27. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 28. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 29. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 30. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 31. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 32. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 33. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 34. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 35. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 36. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 37. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 38. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 39. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 40. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 41. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 42. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 43. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 44. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 45. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 46. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 47. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 48. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 49. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 50. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 51. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 52. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 53. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 54. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 55. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 56. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 57. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 58. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 59. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 60. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 61. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 62. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 63. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 64. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 65. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 66. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 67. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 68. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 69. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 70. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 71. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 72. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 73. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 74. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 75. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 76. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 77. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 78. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 79. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 80. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 81. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 82. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 83. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 84. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 85. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 86. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 87. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 88. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 89. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 90. Heat Map Analysis By Key Players
LIST OF FIGURES
Figure 1. Data Center Construction Market Segmentation, by Geography
Figure 2. PEST Analysis
Figure 3. Ecosystem Analysis
Figure 4. Impact Analysis of Drivers and Restraints
Figure 5. Data Center Construction Market Breakdown by Geography, 2022 and 2030 (%)
Figure 6. Data Center Construction Market Revenue (US$ Million), 2022-2030
Figure 7. Data Center Construction Market Share (%) - by Type Of Construction (2022 and 2030)
Figure 8. Electrical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 9. General Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 10. Mechanical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 11. Data Center Construction Market Share (%) - by Tier Standard (2022 and 2030)
Figure 12. Tier 3: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 13. Tier 4: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 14. Tier 1 and Tier 2: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 15. Data Center Construction Market Share (%) - by Industry Vertical (2022 and 2030)
Figure 16. IT and telecommunication: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 17. BFSI: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 18. Media and Entertainment: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 19. Retail: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 20. Manufacturing: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 21. Government: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 22. Transportation: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 23. Others: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 24. Data Center Construction Market Breakdown by Region, 2022 and 2030 (%)
Figure 25. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 26. North America: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 27. North America: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 28. North America: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 29. North America: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 30. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 31. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 32. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 33. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 34. Europe: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 35. Europe: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 36. Europe: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 37. Europe: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 38. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 39. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 40. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 41. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 42. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 43. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 44. Asia Pacific: Data Center Construction Market Breakdo
The List of Companies - Data Center Construction Market
Rittal GmbH & Co. K.G.
Schneider Electric SE
DPR Construction Inc
Mercury Engineering Ltd
STO Building Group Inc
AECOM
HOLDER CONSTRUCTION COMPANY
Turner Construction Co
Eaton Corp Plc
Nikom InfraSolutions Pvt. Ltd.